# Fuse box in the bathroom: is it legal?

> Banstead electrician: a fuse box in the bathroom breaks the wiring regulations. TMB Electrics moves it outside and tests every circuit. · Call 07460 070551

No, a fuse box in a bathroom does not meet the wiring regulations. TMB Electrics, based in Banstead, fits a new consumer unit in a dry place and tests every circuit.

## Why is there a fuse box in my bathroom?

A consumer unit, the modern name for a fuse box, ends up in a bathroom because the room changed around it. Nobody chooses that spot for a new board.
- **The bathroom was built around the board:** The meter and board sat in a spare room or cupboard first. A bathroom fitted later enclosed them, and the cables from the meter stayed exactly where they were.
- **A conversion used whatever space was free:** When a house was split into flats or bedsits, the meter and board went into the nearest free corner. Sometimes that corner became part of a bathroom.
- **The airing cupboard opens into the bathroom:** Some boards live in a cupboard reached from inside the bathroom. Steam from the shower and heat from the hot water cylinder both reach the breakers.
- **A refit moved the bath or shower:** The zones, the areas around a bath or shower where the rules limit equipment, move with the fittings. A board that once sat clear can end up inside them.
- **An old board nobody questioned:** Rewirable fuse boards from decades ago were often left in place through several bathroom changes. They also give no RCD protection, the safety switch that cuts power when current leaks to earth.

## What can I check safely?

You learn a lot from the doorway with the cover closed and your hands dry. Nothing here needs a screwdriver, and the cover stays shut.
- **Whether the board is in the bathroom:** Stand at the door and see if the board shares the room with the bath or shower. A high fixing, a cupboard door or a small cover does not change the answer.
- **Marks on the outside of the cover:** Look for rust, droplets, green staining or a white powder on the closed cover and around the cable entries. These show moisture has settled on the enclosure.
- **Warmth, a buzz or a burning smell:** A warm cover, a humming sound or a burning smell points to a failing connection inside. Keep everyone out of the bathroom and do not touch the board.
- **Dry hands and clear surroundings:** Keep towels, clothes and bottles away from the board. Dry your hands and feet before touching any switch on it, and never use it straight from the shower.

## When should I book an electrician?

Book as soon as the board shares a room with the bath or shower, because steam and splashes reach live parts there. Book Now.
- **The board is inside the bathroom:** Whatever the condition of the board, it belongs in a dry place outside the room. Moving it is work for an electrician because it involves the incoming supply.
- **The cover shows damp, rust or heat:** Moisture near live parts corrodes the metal and wears out the breakers. Warmth or a burning smell means a joint is already failing, so leave the cover shut.
- **A bathroom refit is coming:** Before tiles and panels go up is the easiest time to move the board. Afterwards the cables have to be reached through finished walls.
- **An EICR has flagged the board:** An EICR, an electrical installation condition report, is a written inspection of the fixed wiring. A board in a bathroom is recorded on it, and the report stays unsatisfactory until the board is moved.

## What happens on the visit?

We fit the new consumer unit outside the bathroom. A board change takes half a day to a day, and the power is off for most of it.
- **The new position is set first:** We look at the supply, the earthing and a dry spot such as a hall cupboard, then write the price for that position. Moving the board means the cables must reach it.
- **Every circuit is tested before it moves:** Each circuit is tested before it goes on the new board, so a hidden fault does not trip the new RCDs the moment the power returns.
- **The old board comes out and the new one goes in:** The new metal consumer unit has RCD and surge protection. Each circuit is reconnected and named. If the meter tails, the thick cables from the meter, need extending, the network operator may need to be involved.
- **Live testing, a walk through and the certificate:** Everything is tested live and you get a walk through of the new board. An Electrical Installation Certificate follows, notified under Part P.

## What does the price cover?

The price covers the new metal consumer unit, the labour, testing of every circuit and the certificate. Moving the board out of the bathroom changes it, because the cables have to reach the new position.
- Consumer unit (CCU) replacement: from £375
- A longer run of cable to the new position adds time and materials, and that is written down before the supply is switched off.
- Earthing or bonding upgrades, where the tests show they are needed, are priced before the board is changed.
- Faults found on existing circuits during testing are priced separately from the board.

## Fuse box in the bathroom questions

### Is it illegal to have a fuse box in the bathroom?

An existing board is not a criminal offence on its own. It does not meet BS 7671, the wiring regulations, which keep switchgear out of the zones around a bath or shower. An inspection report records it, and any alteration to the installation should correct it.

### Can I cover or seal the fuse box instead of moving it?

No. Boxing in or weatherproofing a bathroom board does not make it compliant. It needs moving to a dry place, and that work involves the incoming supply, so it is for an electrician.

### Will I get a certificate when the board is moved?

Yes. An Electrical Installation Certificate is issued after the live testing, and the work is notified under Part P. Keep it with the property records for the next EICR.

### Will my power be off while the board is moved?

Yes, the supply is off for most of the visit, which takes half a day to a day. It comes back once every circuit has been tested on the new board.

## Related problems
- [Burning smell from the fuse box](https://www.tmbelectrics.co.uk/problems/burning-smell-from-fuse-box): A burning smell at the consumer unit can mean an overheating connection or protective device.
- [Fuse box sparking](https://www.tmbelectrics.co.uk/problems/fuse-box-sparking): Sparks from a consumer unit need the affected electrical installation checked urgently.
- [Old fuse box: do I need to upgrade?](https://www.tmbelectrics.co.uk/problems/old-fuse-box): An old fuse box needs testing before replacement, because the wiring behind it matters too.
- [Signs your fuse box needs upgrading](https://www.tmbelectrics.co.uk/problems/fuse-box-needs-upgrading): Signs an older fuse box needs testing or replacement before new electrical work.
- [Still got rewirable fuses at home?](https://www.tmbelectrics.co.uk/problems/rewirable-fuses): Rewirable fuses need testing before a consumer unit replacement is planned.
- [Unsatisfactory EICR: What Happens Next?](https://www.tmbelectrics.co.uk/problems/failed-eicr): C1, C2 and FI findings make an EICR unsatisfactory until the required work is addressed.

## Sources
- [BS 7671: IET Wiring Regulations (18th Edition)](https://electrical.theiet.org/bs-7671/)
- [Electrical safety in the bathroom](https://www.electricalsafetyfirst.org.uk/safety-advice/home-and-people/bathroom/)
- [When Building Regulations approval is needed](https://www.gov.uk/building-regulations-approval/when-you-need-approval)

Updated 2026-11-20.

[Consumer unit replacement](https://www.tmbelectrics.co.uk/services/fuse-board-replacement)

## Book or ask a question