Minor works certification in Horley

A minor works certificate in Horley describes the one job just finished. A new circuit in an interwar semi is written as new, and a single swap stays a swap.

Calls answered 24/7

  • 14 years trading
  • Local to Banstead
  • Clear, upfront quotes

What a Horley minor works certificate covers

The certificate for the one circuit added, or the one accessory swapped, is covered here. A second circuit is a second certificate.

From £80

Included

  • A check of the altered circuit and the work just completed
  • The tests required for that addition or alteration
  • A completed minor works certificate with the circuit details
  • A copy for you to keep with the property records
  • Confirmation that the change does not include a new circuit

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Pay by bank
  • Bank transfer
  • The sheet matches the job just finished and nothing beyond it.
  • The landlord report is not this sheet.
  • Changing the board near the station needs another certificate.

Minor works certification across Horley

We serve Horley from our base in Banstead.

Victoria RoadMassetts RoadChurch RoadHorley RowMeath Green LaneLangshottWestvale ParkBalcombe Road

What happens on the day

The certificate matches the one job just finished. A new circuit in an interwar semi along Limes Avenue or the Haroldslea roads is described as new, not as a rewire of that house. Swapping one accessory for another stays that swap. Off Massetts Road the sheet can note that the circuit was added where older wall wiring may sit behind a recent board. The certificate is not the report a privately rented home needs. Changing the board near the station needs its own sheet.

  • Describe the job that finishedThe form names the circuit added or the accessory swapped. The rest of the house, including an extended station terrace, stays off that sheet.
  • Call a new circuit newAlong Limes Avenue a circuit that was added is written as added. It is not described as a rewire of the Haroldslea roads.
  • Note the older wiringOff Massetts Road the sheet can say the circuit was added beside older wall wiring. That note is not a promise to renew the wiring.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose TMB Electrics

Photo of Trevor BushTrevor BushElectrician
Reviews
39
Rating
5.0
Trading since
2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”

Trevor Bush, TMB Electrics

Book Now

Photos of our work

Sockets and under-unit lighting in a fitted shaker kitchen
First fix back boxes and downlights in a stripped kitchen
Ceiling downlights and a wall light in a finished living room
Downlights and a pendant above a kitchen island
Backlit bathroom mirror and heated towel rail installed
First fix cabling and a back box in a stud wall

Questions about minor works certificates in Horley

Still have a question?

Does one certificate cover the whole house?

No. It covers the circuit added or the accessory swapped. An extended station terrace is not certified in full by that one sheet.

How is a new circuit along Limes Avenue described?

As a new circuit. Interwar semis there are not written up as a rewire because one circuit was added.

What if the work off Massetts Road sits on older wiring?

The sheet can say so. Recording that the wall wiring is older is not the same as renewing it. The wiring stays.

Is a like for like swap written as a new circuit?

No. One accessory changed for another stays a swap. The form does not pretend we added a circuit. The sheet stays with the swap.

Can this replace the rental report?

No. Privately rented homes still need their own report on the certificate cycle. One new circuit is not that report.

Book or ask a question

Calls answered 24/7