Socket and switch installation in Ewell
TMB Electrics, based in Banstead, adds sockets in Ewell after tests show whether the new point can join a circuit or needs its own. West Ewell around Chessington Road usually needs its own.
Calls answered 24/7
- 14 years trading
- Local to Banstead
- Clear, upfront quotes
Ewell socket price
Sockets in Ewell are priced for the points named, after a test decides between a spur and a new circuit. Chessington Road new circuits cost more than a London Road spur, and the quote says which.
From £80
Included
- Fitting one extra single or double socket on an existing domestic circuit
- Fitting or replacing a light switch on an existing circuit
- Isolation of that circuit at the consumer unit before cables are joined
- Testing of the new point and the circuit that feeds it
- A minor works certificate when the change needs one
Ways to pay


- Pay by bank
- Bank transfer
- A new circuit is a different figure from a spur on a healthy circuit.
- Faceplates that were not named are not swapped in on the day.
- Making good of decoration is outside the electrical figure.
Socket and switch installation across Ewell
We serve Ewell from our base in Banstead.
What happens on the day
A new socket is not assumed to be a spur. The circuit is tested first. Around Chessington Road the usual answer is an added circuit, because those streets want extra circuits rather than a rewire. London Road and Ewell Court rooms may join an existing circuit when the tests allow it. The faceplate goes where you mark it, clear of High Street finishes that must stay.
- Test before the faceplateThe circuit that might feed the new socket is tested. If it has no capacity, the socket is not added to it. Chessington Road then takes a new circuit instead.
- Mark clear of finishesOn the High Street and Church Street the faceplate sits clear of finishes that must stay. A chase through protected fabric is not started so a socket can move a few inches.
- Fit and test the pointThe socket is fitted at the mark and tested. A USB faceplate or a specific finish is used only when the quote names it. The certificate matches the work actually done.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose TMB Electrics
- Reviews
- 38
- Rating
- 5.0
- Trading since
- 2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”
Trevor Bush, TMB Electrics
Book NowPhotos of our work
Why might Chessington Road not get a simple spur?
Those streets generally need extra circuits. If the tests show the existing circuit is full, the socket goes on a new circuit instead of an overloaded one.
When can a London Road socket join the circuit already there?
When the tests show that circuit can take it. If they do not, we stop and describe a new circuit rather than adding the point anyway.
Will you chase a listed High Street wall for one socket?
Not through a finish that has to stay. The position moves to a spot the fabric allows, or the job waits.
Are USB sockets the default?
No. A plain socket is fitted unless the quote names a USB or a metal finish. Say so before the day if you want that plate.
Does this include the kitchen appliance points?
Only if they are the points named. A hob and oven refit is the kitchen job, not a single socket visit.
