Electrician day rate in Wallington

A day in Wallington follows the tasks named before the visit. A wide road board change, a due certificate and a Roundshaw charger are not spare hours.

Calls answered 24/7

  • 14 years trading
  • Local to Banstead
  • Clear, upfront quotes

What a Wallington day includes

Hours used on tasks listed before anyone arrives are this price. Parts that nobody put on that list are extra. A trench, a consumer unit change and a certificate are not swallowed because an hour was left.

From £80 an hour

from £80 an hour

Included

  • Time on site for mixed electrical labour
  • Fault tracing, small repairs and fittings within the booked hours
  • Testing of the circuits worked on
  • A written price for extra hours before they begin
  • A minor works certificate when the labour needs one

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Pay by bank
  • Bank transfer
  • A task noticed on site joins the list only when it is written on before it starts.
  • A landlord certificate is not produced out of the day's tasks.
  • A circuit that has failed its test is not put back on so the list can be finished.

Electrician day rate across Wallington

We serve Wallington from our base in Banstead.

Woodcote RoadWallington GreenManor RoadStanley Park RoadBandonhillRoundshawBeddingtonHackbridge

What happens on the day

The tasks are named before arrival: a point to test, a fitting to change, or a small job in a house on Stanley Park Road. Time left does not become a new board for a wide road extension the original board was never meant for. It does not become the landlord certificate a flat on Woodcote Road is due. It does not become a charger at Roundshaw. A house on Manor Road is not rewired because the afternoon went quiet.

  • Close the list firstTasks are named before anyone arrives. Something noticed on site joins in only if the tests and the hours still allow it, and only once it has been added to the note.
  • Keep the big jobs off the dayA board change, a landlord certificate and a charger are each their own booking. None of them is folded into the afternoon.
  • Stop a failed circuitA circuit that fails its test stays off and is written down. Anything else continues only if it is still safe to touch.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose TMB Electrics

Photo of Trevor BushTrevor BushElectrician
Reviews
39
Rating
5.0
Trading since
2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”

Trevor Bush, TMB Electrics

Book Now

Photos of our work

Downlights and a smoke alarm in a newly plastered ceiling
Under-cabinet lights, socket and grid switch above a worktop
Sockets and under-unit lighting in a fitted shaker kitchen
First fix back boxes and downlights in a stripped kitchen
Ceiling downlights and a wall light in a finished living room
Downlights and a pendant above a kitchen island

Questions about a Wallington day

Still have a question?

Can a quiet afternoon become a new board?

No. On a wide road semi, a board that was never meant for the extension is its own appointment. Spare time at the end of the list does not turn into that change.

Will the day write the certificate a flat is due?

No. A flat over the Woodcote Road shops that is due a landlord certificate needs that inspection booked by itself. The day does not type it up.

Is a charger at Roundshaw absorbed into the hours?

No. Houses rebuilt from 1998 usually have a charger as its own circuit. It is not tacked on because the list ended early.

Does a quiet afternoon rewire a house on Manor Road?

No. Extensions around Manor Road may need a board that can take them. That change is not pulled in just because the written tasks finished early.

What happens when a test fails part way through?

The failed circuit stays off and is noted. Remaining tasks go on only if they are still safe. The list is not finished by ignoring that failure.

Book or ask a question

Calls answered 24/7