Electrician day rate in Chipstead

A day in Chipstead is the list written down before anyone sets off. A stable feed, an inspection and a consumer unit change are not spare tasks added because time remains.

Calls answered 24/7

  • 14 years trading
  • Local to Banstead
  • Clear, upfront quotes

What a Chipstead day includes

The figure is the time spent on the written list. Materials are additional when they were not already allowed for. A trench to a stable is not absorbed because the day had an hour left.

From £80 an hour

from £80 an hour

Included

  • Time on site for mixed electrical labour
  • Fault tracing, small repairs and fittings within the booked hours
  • Testing of the circuits worked on
  • A written price for extra hours before they begin
  • A minor works certificate when the labour needs one

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Pay by bank
  • Bank transfer
  • Tasks added on site are written down before they start.
  • An inspection report is not typed up from a day list.
  • A failed circuit is not pressed back into service to finish the list.

Electrician day rate across Chipstead

We serve Chipstead from our base in Banstead.

High RoadOutwood LaneStarrock LaneHazelwood LaneHow LaneCoulsdon LaneHazel WayChipstead stationShabden Park

What happens on the day

The day is a written list: a point tested, a fitting changed, or a small task in a garage that already has a feed. Houses on How Lane are not given extra circuits because the afternoon is quiet. Replacing a feed to a stable, inspecting the whole installation, or changing a consumer unit is booked as that job. A cottage near the cricket green is not rewired under a day list. Hours still on the clock do not overrule a failed test.

  • Close the list firstTasks are written before anyone sets off. A job noticed on site is added only when the tests and the time still allow it, and only by writing it on.
  • Keep large jobs off the dayA new feed to a stable or garden room, a full inspection, and a consumer unit change are not folded into the afternoon. Each has its own booking.
  • Stop a failed circuitA circuit that fails its test stays switched off and is written down. Anything else on the list carries on only while it remains safe.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose TMB Electrics

Photo of Trevor BushTrevor BushElectrician
Reviews
39
Rating
5.0
Trading since
2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”

Trevor Bush, TMB Electrics

Book Now

Photos of our work

Cooker control switch and sockets fitted above a worktop
External electricity meter cabinet mounted on a brick wall
Downlights and a smoke alarm in a newly plastered ceiling
Under-cabinet lights, socket and grid switch above a worktop
Sockets and under-unit lighting in a fitted shaker kitchen
First fix back boxes and downlights in a stripped kitchen

Questions about a Chipstead day

Still have a question?

Can the day include a new stable feed?

No. A feed to a garage, stable or garden room that can no longer carry its load is its own circuit. It is not a spare hour.

Will you change the consumer unit if there is time?

No. A board change is booked as a board change. Time left on a day in a How Lane house does not become that job.

Is the cottage rewired if the cable looks old?

No. Older cabling behind a newer unit may be noted. Replacing the cable that follows a High Road cottage is the rewire, not the day.

What if a test fails halfway through?

That circuit stays off. We write it down. Other tasks carry on only while they are still safe. A failed test is not talked past.

Does the day include the rented home report?

No. The inspection is booked by itself. Someone can mention that a report is due, and the day ends that subject there.

Book or ask a question

Calls answered 24/7