Armoured cable supply run in Worcester Park
TMB Electrics, based in Banstead, runs armoured cable in Worcester Park only as a new feed to a detached building. A rear extension on Cheam Common Road is not that job.
Calls answered 24/7
- 14 years trading
- Local to Banstead
- Clear, upfront quotes
Worcester Park armoured cable price
SWA is used for one feed to a detached building, at the depth and length written down before digging. It is not a rewire of the house. A rear extension on Green Lane is part of the house and is not trenched by default. The Hamptons rarely need this.
From £250
Included
- Planning the cable path from the consumer unit or isolator to the far end
- Laying of steel wire armoured (SWA) cable, buried or clipped as the quote sets out
- Glands and terminations at both ends
- Continuity and insulation resistance tests on the new run
- A minor works certificate or installation certificate for the circuit
Ways to pay


- Pay by bank
- Bank transfer
- Paths and planting are put back only when that was written with the feed.
- A board change at either end is described on its own.
- Inside the building, past the point where the feed lands, is the outbuilding task.
Armoured cable supply run across Worcester Park
We serve Worcester Park from our base in Banstead.
What happens on the day
Armoured cable in Worcester Park is for a detached building whose feed has failed a test, or that never had one. The house itself is not rewired. The line is marked on the ground before anyone digs, and the depth and the length are the ones already written down. A rear extension on Cheam Common Road or Green Lane is part of the house on the original layout, and it is not given an armoured run across the garden by default. Newer homes at The Hamptons are mostly small works and rarely need this.
- Mark the line firstThe run from the board out to the detached building is marked before a trench starts. Pictures of both ends belong with that plan. A socket that still works at the far end does not excuse a cable that has not been tested.
- Leave the extension in the houseCheam Common Road semis extended at the back are cabled as house circuits. An armoured run is not the way those rooms are fed, unless a detached building is genuinely the destination.
- Land on the right boardThe feed terminates on the board that serves the detached building. A modern board at The Hamptons is used only when that house actually has a building to feed. Central Road flats are not trenched to the parade.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose TMB Electrics
- Reviews
- 38
- Rating
- 5.0
- Trading since
- 2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”
Trevor Bush, TMB Electrics
Book NowPhotos of our work
Is a rear extension on Cheam Common Road fed with armoured cable?
No. It is part of the house, on the original circuit layout. Armoured cable is for a detached building that needs a feed of its own.
When is a new feed used?
When the cable that is there fails a test, or when the building has never had a feed. A lamp that still lights is not a reason to reuse an untested cable.
Do The Hamptons usually need this?
No. Newer homes off Caldbeck Avenue are mostly small works. This run is quoted only when a detached building needs a feed.
Does the new feed rewire the house near the station?
No. It is one added circuit. A rewire and a board change near Worcester Park station stay as their own jobs.
Is the trench depth chosen on the day?
No. The depth and the length are written down before the day. Moving either one is costed before the line shifts, and the trench is not guessed on site.
