Electric shower installation in Worcester Park
TMB Electrics, based in Banstead, installs an electric shower in Worcester Park on a circuit that can carry the rating. Green Lane semis on the original layout are tested first.
Calls answered 24/7
- 14 years trading
- Local to Banstead
- Clear, upfront quotes
Worcester Park shower price
Green Lane semis still on the original circuit layout are costed as a new shower circuit when the old cable cannot carry the rating. The Hamptons, where a modern board has a spare way, are a smaller addition. A pull cord is part of the shower work.
From £220
Included when agreed
- Checking the existing circuit and breaker against the shower rating
- Connecting the shower and fitting or replacing the pull cord isolator
- Testing and a certificate for the work
Ways to pay


- Pay by bank
- Bank transfer
- A Hamptons board with no spare way is described before any shower is ordered.
- Tiles past the fixing points, and the wall afterwards, sit on their own line.
- The shower unit is added only when its model was named in advance.
Electric shower installation across Worcester Park
We serve Worcester Park from our base in Banstead.
What happens on the day
A shower needs a circuit matched to its rating, plus a pull cord where the switch cannot be reached safely. 1930s semis on Green Lane and Cheam Common Road still run the original layout, so the shower is rarely a spur off an old circuit. A rear extension is a different room from the original bathroom. Newer homes at The Hamptons may have a spare way on a modern board, and that way is confirmed rather than assumed.
- Match the ratingThe shower rating is checked against the cable and the protection. Green Lane houses on the original layout do not get the unit connected until that match is real. A working light in the room is not spare capacity.
- Treat the extension as its own roomCheam Common Road semis extended at the back may have the shower in the new part. That room is planned on its own circuit. The original bathroom circuit is left unless it is the one being replaced.
- Fit the pull cordThe pull cord goes with the shower, placed so it can be used without leaning into the water. In a Central Road flat the cord and the cable stay inside that flat.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose TMB Electrics
- Reviews
- 38
- Rating
- 5.0
- Trading since
- 2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”
Trevor Bush, TMB Electrics
Book NowPhotos of our work
Can the original layout on Cheam Common Road feed a new shower?
Only if the cable and the protection match the rating. Those semis are still on the original circuits, and a working socket nearby does not settle the question.
Is a shower in the rear extension a separate circuit?
Yes when the extension is the room being fitted. Green Lane houses were extended at the back, and that room is not presumed to share the original bathroom circuit.
Do The Hamptons already have a way for a shower?
Sometimes. The boards there are modern. A spare way is used when it exists, and a full board is named before any tiling comes off.
Do you fit a pull cord in a Central Road flat?
Yes where the switch would otherwise be within reach of the water. The work stays inside that flat. The parade below is not opened.
Is the rest of the bathroom rewired?
No. The job is the shower circuit and its controls. Other circuits stay. Near the station a full rewire is a different conversation.
