How far can an EV charger be from the consumer unit?
An EV charger can be fitted away from the consumer unit when the cable run is designed for the distance and load. TMB Electrics installs the dedicated circuit in Banstead.
Calls answered 24/7
- 14 years trading
- Local to Banstead
- Clear, upfront quotes
Why is the parking space far from the consumer unit?
The consumer unit is often inside the house while the car parks beside a driveway, garage or front boundary. The charger needs a dedicated circuit that reaches the parking space safely.
- The consumer unit is inside the houseA consumer unit is the board that protects the electrical circuits in a property. The cable may need to run from that board through the building and outside to reach the charger.
- The car parks away from the buildingA driveway or parking space can sit some distance from the wall where the consumer unit is fitted. The cable length and the path between them affect the installation.
- The cable needs a safe pathThe cable may run along a wall, through a garage or underground across part of the property. The path needs to protect the cable and leave the charger where the vehicle can reach it.
What can I check safely before booking?
You can look at the parking position and note the visible parts of the property without opening the consumer unit or touching electrical wiring.
- Check where the car usually parksNote the usual parking position and which side of the vehicle would be nearest a wall mounted charger. This helps show how far the charger would sit from the consumer unit.
- Look at the visible path between house and parkingNote whether the path passes along an outside wall, through a garage, across a garden or beside a driveway. Do not lift covers, dig, or touch any cable.
- Take clear photographs from a distancePhotographs of the consumer unit from the outside, the parking space and the visible route can show the layout. Leave the consumer unit cover closed.
When should I book EV charger installation?
Book Now when the parking space is away from the consumer unit and the cable needs planning before the charger position can be confirmed.
- The cable crosses part of the propertyA run through a garage, along an outside wall or across a garden needs a planned cable path before installation.
- The consumer unit may need extra capacityThe existing consumer unit, earthing and supply need checking before a dedicated EV charger circuit is added.
- The charger position is not obviousA visit can establish where the charger can sit so the cable reaches the vehicle without creating an awkward lead position.
What happens when the charger is far from the consumer unit?
The visit starts with the consumer unit and parking position, then follows the cable path to the planned charger location.
- The supply and consumer unit are checkedThe consumer unit, main fuse and earthing are checked to establish whether the property can take the dedicated charger circuit.
- The cable path is plannedThe distance from the consumer unit to the charging position is measured and the cable path is set out around the building and parking space.
- The charger circuit is fitted and testedThe cable is run to the charging position, the charger is connected, and the new circuit is tested before the installation documentation is completed.
What does the EV charger price cover?
The price covers the charger installation and a standard cable run from the consumer unit to the charging position. The price changes when the distance needs more cable, the path needs extra work, or the consumer unit needs work before the charger circuit can be fitted.
From £400
Included when agreed
- A dedicated circuit from the consumer unit with the right RCD protection
- The cable run to the charging position, clipped or in conduit
- Mounting and connecting the charger and setting it up on the app
- Testing, certification and notification to the electricity network
Not included automatically
- The charger unit, unless supplied by you or agreed in the quote
- Digging or trenching for a cable across a garden
- A consumer unit upgrade where the existing board cannot take the circuit
Ways to pay


- Pay by bank
- Bank transfer
- A longer cable run changes the price because it needs more cable and installation time.
- Groundwork, a difficult cable path or consumer unit work changes the price before installation.
- The charger unit is priced separately unless you already have one.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Why choose TMB Electrics
- Reviews
- 39
- Rating
- 5.0
- Trading since
- 2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”
Trevor Bush, TMB Electrics
Book NowCan an EV charger be far from the consumer unit?
Yes. The circuit needs cable sized for the distance and the charger load, with a safe path from the consumer unit to the charging position. The parking position and cable path are checked before the installation is priced.
Does a longer EV charger cable run cost more?
A longer run can change the price because it uses more cable and can take more time to install. Groundwork, access through the property and consumer unit work can also change the installation price.
Can the cable run across a garden or driveway?
A cable can be planned through the property to reach the charger position. The installation needs a suitable path that protects the cable and suits the layout of the home.
Do I need a new consumer unit for an EV charger?
Not every home needs a new consumer unit. The existing board, supply, earthing and available capacity are checked before the charger circuit is fitted.
Related problems
- Problems after EV charger installationA charger fault can come from its supply, protection, cable run or charging equipment.
- Told Your Supply Will Not Take A 7kW Charge PointA supply check identifies whether a 7kW charge point needs changes before installation.
- Two electric cars and one charge pointOne charge point can serve two cars, while a second charger needs its own assessed circuit.
- Aluminium wiring in the houseAluminium wiring needs inspection and testing before any repair, upgrade or added circuit.
- Burning plastic smell from electricsA burning plastic smell needs the affected electrical circuit checked before it is used again.
- Burning smell from the fuse boxA burning smell at the consumer unit can mean an overheating connection or protective device.
Sources
- IET: Code of Practice for Electric Vehicle Charging Equipment Installation
- IET: BS 7671 Wiring Regulations
Updated 19 November 2026
