Told Your Supply Will Not Take A 7kW Charge Point
A main fuse rating does not by itself rule out a 7kW charge point. TMB Electrics checks the supply, consumer unit and charging load to establish what work the installation needs.
Calls answered 24/7
- 14 years trading
- Local to Banstead
- Clear, upfront quotes
Why will a supply not take a 7kW charge point?
A 7kW charge point adds a sustained electrical load, so the incoming supply, consumer unit and other electricity use must be checked together.
- The incoming supply needs checkingThe main fuse and incoming cables are part of the electricity supply. Their rating alone does not show whether the property can add a charge point alongside normal use.
- The consumer unit has no suitable capacityA charge point needs its own protected circuit. A full consumer unit or one without suitable protection can need work before that circuit is added.
- The property has high electrical demandElectric showers, cooking equipment, heating and other loads can affect how a charge point is designed. The charging load is considered with the equipment already in use.
- The earthing arrangement needs assessmentThe earthing arrangement is checked before the charge point is connected. It forms part of the electrical installation that protects the property and people using it.
What can I check safely before booking?
You can gather useful details without opening the consumer unit, touching mains wiring or handling the main fuse.
- Photograph the consumer unit from outsideTake a clear photograph with the cover closed, including the circuit labels where they can be read. Do not remove the cover or touch switches other than normal controls.
- Note the vehicle and charging positionRecord the vehicle, where it parks and where you would want the charge point. This helps show the likely cable run between the consumer unit and parking position.
- List major electrical equipmentNote equipment such as an electric shower, electric heating, cooker or hot water cylinder. This helps show what may run while the vehicle is charging.
When should I book a charge point supply check?
Book a check before buying a charge point when the supply, consumer unit or cable run has been questioned.
- You have been told the main fuse is too smallA main fuse comment needs the wider installation checked. The supply, protective devices and expected charging load determine what work may be needed.
- The consumer unit is full or olderA charge point needs a dedicated circuit. The consumer unit must be assessed before a new circuit can be planned.
- The parking position is far from the consumer unitA longer cable run affects the installation work. The route is checked so the charge point can be planned from the actual property layout.
What happens when a charge point supply is checked?
The visit establishes how the charge point can connect to the property before installation work is planned.
- The supply and consumer unit are checkedThe incoming supply, main protective equipment, consumer unit and earthing arrangement are assessed for the proposed charge point circuit.
- The charging load is consideredThe vehicle charging load is considered alongside the property electrical equipment. This identifies whether further electrical work is needed.
- The cable run is assessedThe path from the consumer unit to the parking position is checked. The route determines the cable work and charge point position.
- The installation work is set outThe work needed for the dedicated circuit, charge point connection, testing and required documentation is explained before installation begins.
What does the charge point installation price cover?
The price covers the standard EV charger installation work shown on the service card. It changes when the property needs a longer cable run, consumer unit work, changes to the supply arrangement, groundwork or other work identified during the assessment.
From £400
Included when agreed
- A dedicated circuit from the consumer unit with the right RCD protection
- The cable run to the charging position, clipped or in conduit
- Mounting and connecting the charger and setting it up on the app
- Testing, certification and notification to the electricity network
Not included automatically
- The charger unit, unless supplied by you or agreed in the quote
- Digging or trenching for a cable across a garden
- A consumer unit upgrade where the existing board cannot take the circuit
Ways to pay


- Pay by bank
- Bank transfer
- The standard installation covers the dedicated charge point circuit, connection, testing and required documentation.
- Consumer unit work changes the price when the existing unit cannot take the new circuit.
- A longer cable run or groundwork changes the price because more installation work is needed.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Why choose TMB Electrics
- Reviews
- 39
- Rating
- 5.0
- Trading since
- 2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”
Trevor Bush, TMB Electrics
Book NowDoes a smaller main fuse mean I cannot have a 7kW charge point?
No. The main fuse is one part of the assessment. The incoming supply, consumer unit, earthing arrangement and other electrical demand are checked before the charge point circuit is planned.
Can a consumer unit be changed for a charge point?
A consumer unit can be changed when the existing unit cannot take the dedicated circuit or does not provide suitable protection. The condition of the existing circuits is checked before consumer unit work is planned.
Does a 7kW charge point need its own circuit?
Yes. A 7kW charge point is connected on a dedicated circuit from the consumer unit. This keeps the charging load separate from circuits serving sockets, lighting and household equipment.
What should I send before a charge point visit?
Send photographs of the closed consumer unit, meter position and parking position. Include the vehicle details and any major electrical equipment such as an electric shower or electric heating.
Related problems
- How far can an EV charger be from the consumer unit?A longer cable run can work when the circuit, cable and charging position are assessed together.
- Problems after EV charger installationA charger fault can come from its supply, protection, cable run or charging equipment.
- Two electric cars and one charge pointOne charge point can serve two cars, while a second charger needs its own assessed circuit.
- Aluminium wiring in the houseAluminium wiring needs inspection and testing before any repair, upgrade or added circuit.
- Burning plastic smell from electricsA burning plastic smell needs the affected electrical circuit checked before it is used again.
- Burning smell from the fuse boxA burning smell at the consumer unit can mean an overheating connection or protective device.
Sources
- IET: Electric vehicles guidance and codes of practice
- GOV.UK: Connecting electric vehicle chargepoints to the electricity network
- National Grid Electricity Distribution: Electric vehicles
Updated 19 November 2026