Check the property and supply
The survey covers the consumer unit, supply capacity, earthing, route, parking space and charger position.
EV charger installation adds a dedicated chargepoint and electrical circuit after the supply, parking position, cable route, charger requirements and network process have been checked. Based in Banstead — also serving Sutton, Wallington, Reigate, Purley and Epsom.
The published price appears below. The survey confirms the charger, cable route, supply and any extra work.
The property, parking space, vehicle and electrical supply all affect the installation.
The survey covers the consumer unit, supply capacity, earthing, route, parking space and charger position.
Confirm vehicle compatibility, connector, position, smart features and the charging rate the property and vehicle can support.
Check landlord or site permission, network approval and any grant steps that must happen before installation.
The quote should state the charger, route, protective equipment and any work outside a standard installation.
Confirm the survey and permissions before the charger is fitted.
Share the vehicle, parking, supply and cable-route details. A site visit is arranged when needed.
Complete any required permissions or network steps, then fit the chargepoint and dedicated circuit.
Commission the charger, explain the controls, provide the certificate and complete the required network notification.
The handover confirms the charger works and records the electrical installation.
Published customer reviews may cover different types of electrical work, not only EV charging.
5.0
Efficient job, well organised with good communication
AlanMyJobQuote
Trevor was amazing very constructive as he faced real problems with our current set up but he managed to find solutions and did an excellent job! I would recommend him to anyone, trustworthy and high level of expertise, look no further! Thank you Trevor
AnetteMyJobQuote
Trevor went over and beyond trying to sort out the recommissioning of my electrical installation. He spoke with my provider and the EICR certificate was ready in minutes. I will highly recommend
EmmanuelMyJobQuote
Banstead, Sutton, Wallington, Reigate, Purley, Epsom, Kingswood, Surrey, Coulsdon, Tadworth, Ewell
What to check before arranging installation.
It depends on the charger, route, parking position, existing electrical equipment and any supply or groundworks. The survey confirms the quote.
Not always. The electrician checks the existing board, supply and protective arrangements first.
The rate depends on the chargepoint, available supply and the vehicle’s own charging limit. Confirm the expected rate before work starts.
EV chargepoints must be registered with the local distribution network operator. The installer determines whether approval is needed before work or notification can follow it.
Some properties and applicants may qualify under current schemes. Rules change, so check GOV.UK and complete any required approval before installation.
TMB Electrics works in Banstead, Sutton, Wallington, Reigate, Purley, Epsom, Kingswood, Surrey, Coulsdon, Tadworth, Ewell. Send the postcode to check the team can visit the property.
Check the current network and smart-chargepoint requirements before installation.
Send a few details about the job and your postcode. I’ll review them, confirm coverage and come back with a quote.