Signs worth investigating
Rubber or fabric-covered cable, no earth at lighting points, an old fuse board or repeated faults are reasons to inspect, not automatic proof that a rewire is required.
Rewiring replaces a property's fixed wiring, accessories and circuit protection. A survey establishes whether a full rewire, a partial rewire or targeted remedial work is the right answer before any price or timescale is agreed.
Rewiring is priced after a survey. The published rate or starting price below is a guide until the property has been seen.
Age alone does not mean a property needs rewiring. Inspection and testing should establish the real condition first.
Rubber or fabric-covered cable, no earth at lighting points, an old fuse board or repeated faults are reasons to inspect, not automatic proof that a rewire is required.
All fixed wiring, accessories and circuit protection are replaced. This is the most disruptive option and normally suits a property being renovated or stripped back.
Only the circuits that testing shows are unsuitable are replaced. This can be right where earlier work has already renewed part of the installation.
Sometimes an inspection shows specific defects that can be corrected without rewiring. The report should explain what the evidence supports.
The quote records the agreed circuits, accessories, consumer unit and the boundary between electrical work and building work.
The process differs a great deal between an occupied home and an empty property, so agree the plan before booking.
The electrician inspects and tests the existing installation, then explains whether a full rewire, partial rewire or remedial work is supported by the findings.
Agree the circuit schedule, socket and switch positions, lighting points and consumer unit location before first fix starts.
Cable routes are formed, back boxes fitted and new cabling run. This is the dusty, disruptive stage and normally needs rooms cleared.
Accessories, lighting points and the consumer unit are fitted and connected once the surfaces are ready.
The installation is inspected and tested, the board is labelled, and the certificate and notification are provided.
The handover records the new installation and anything left outside the agreed scope.
Published customer reviews may cover different types of electrical work, not only rewiring.
5.0
Efficient job, well organised with good communication
AlanMyJobQuote
Trevor was amazing very constructive as he faced real problems with our current set up but he managed to find solutions and did an excellent job! I would recommend him to anyone, trustworthy and high level of expertise, look no further! Thank you Trevor
AnetteMyJobQuote
Trevor went over and beyond trying to sort out the recommissioning of my electrical installation. He spoke with my provider and the EICR certificate was ready in minutes. I will highly recommend
EmmanuelMyJobQuote
Banstead, Sutton, Wallington, Reigate, Purley, Epsom, Kingswood, Surrey, Coulsdon, Tadworth, Ewell, Horley
What to know before committing to a rewire.
Not necessarily. An inspection and test of the existing installation should establish its condition. Age, cable type and previous work all matter, but the report should explain what the evidence supports.
It depends on the property size, number of circuits, access, finishes and the accessories you choose. A survey is needed before any realistic price can be given.
It varies with the property and whether it is occupied. The electrician should give an expected duration after the survey rather than a standard figure.
Often yes, though it is disruptive. Rooms are worked on in stages, power is off for periods and floors or walls may need access. An empty property is usually quicker.
First fix is running the new cables and fitting back boxes before surfaces are finished. Second fix is fitting the sockets, switches, lighting points and consumer unit afterwards.
Some chasing, floorboard lifting and drilling is normally unavoidable. The quote should state how much making good is included and what is left for other trades.
Yes, for parts of the work. The electrician should explain when circuits will be off and what temporary supplies, if any, can be arranged.
In England, a rewire is notifiable building work. The electrician should explain how the work will be certified and notified before it starts.
You should receive an Electrical Installation Certificate covering the completed work, plus the relevant Building Regulations compliance record.
TMB Electrics works in Banstead, Sutton, Wallington, Reigate, Purley, Epsom, Kingswood, Surrey, Coulsdon, Tadworth, Ewell, Horley. Send the postcode to check the team can visit the property.
Independent and government guidance covers certification and when approval is needed.
Send a few details about the job and your postcode. I’ll review them, confirm coverage and come back with a quote.