Bronze
Lower rates on every job, plus a free safety certificate each year.
- 5% off labour
- 5% off certificates
- Free safety certificate, once a year
TMB Electrics replaces old fuse boxes with modern consumer units across Banstead and Surrey, with RCD protection on every circuit, tested and certified on the day.
The old unit comes out and a new metal consumer unit goes in, with every circuit tested.
A board change takes half a day to a day. The power is off for most of it.
Every circuit is tested before it goes on the new board, so a hidden fault does not trip the new RCDs.
The old unit comes out, the new one goes in and each circuit is reconnected and labelled.
Everything is tested live, you get a walk through of the new board, and the certificate follows.
A consumer unit replacement is priced per board. The price includes the new unit, the labour and the certificate.
Protection against electric shock and fire, and a board with room to grow.
Official and independent guidance on replacing a consumer unit.
Circuits tested before the swap, a tidy labelled board, and the certificate on the day.
Bronze, Silver and Gold plans provide lower rates, an annual safety certificate and priority booking on the higher plans.
Lower rates on every job, plus a free safety certificate each year.
Double the discount, next-day priority, and a free safety certificate each year.
Best rates, same-day priority booking, three free safety certificates a year.
These photographs show work completed across the wider service area covered by TMB Electrics; they are not all presented as fuse board and consumer unit upgrade work.
What people ask about replacing a fuse board.
From £375 fitted, including the consumer unit, the labour, testing and the certificate.
— Trevor Bush
Half a day to a day. The power is off while the board is being changed.
— Trevor Bush
Usually, yes. Every circuit is tested first. If a fault is found, TMB Electrics provides a separate price before repair work proceeds.
Yes. TMB Electrics certifies and notifies the work under Part P and provides the certificate.
A clear photograph of the existing board can provide enough information for TMB Electrics to prepare a quote.