Consumer unit replacement in Banstead

TMB Electrics replaces old fuse boxes with modern consumer units, fitting RCD protection on every circuit and providing the complete testing and certification your property requires.

Calls answered 24/7

  • 14 years trading
  • Local to Banstead
  • Clear, upfront quotes

Fuse board replacement price

A consumer unit replacement is priced per board. The price includes the new unit, the labour and the certificate.

From £375

Included when agreed

  • A new metal consumer unit with RCD protection and surge protection
  • Every existing circuit reconnected and labelled
  • Testing of every circuit before the power goes back on
  • An Electrical Installation Certificate, notified under Part P

Not included automatically

  • Repairs to faults the testing finds on existing circuits
  • New circuits, which are priced separately
  • Upgrading the main earthing or bonding, if needed, which is quoted before the work

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Pay by bank
  • Bank transfer
  • Faults found on existing circuits during testing are quoted separately.
  • Earthing and bonding upgrades, where needed, are quoted before the board is changed.

View the fuse board replacement cost guide

Electrician testing a domestic consumer unit during electrical fault finding by TMB Electrics

When to replace a fuse board

The fuse board, or consumer unit, protects every circuit in the house. Old ones do not protect people from electric shock the way modern ones do.

  • Wire fuses or a wooden boardNo RCD protection at all. Replacing it is the single biggest safety improvement in an older house.
  • No RCD on the socketsMany 1980s and 1990s boards have breakers but no RCDs. An RCD cuts the power in milliseconds if something goes wrong.
  • Before adding circuitsAn EV charger, an electric shower or a kitchen refit often needs space and protection the old board does not have.
  • After an EICRA C2 on the board is the most common reason a rented home fails its EICR.

What happens on the day

A board change takes half a day to a day. The power is off for most of it.

  • Test the circuits firstEvery circuit is tested before it goes on the new board, so a hidden fault does not trip the new RCDs.
  • Swap the boardThe old unit comes out, the new one goes in and each circuit is reconnected and labelled.
  • Test and certifyEverything is tested live, you get a walk through of the new board, and the certificate follows.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose TMB Electrics

Photo of Trevor BushTrevor BushElectrician
Reviews
38
Rating
5.0
Trading since
2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”

Trevor Bush, TMB Electrics

Book Now

Photos of our work

Small consumer unit fitted above the meter on a brick wall
Inside a consumer unit with labelled circuit conductors
Compact consumer unit with surge protection and labelled circuits
Open consumer unit showing neatly dressed circuit wiring
Scorched downlight and burnt ceiling around a halogen lamp
Consumer unit with bell transformer on a plastered wall

Fuse board questions

Still have a question?

How much does a new fuse board cost?

From £375 fitted, including the consumer unit, the labour, testing and the certificate.

How long does it take to change a consumer unit?

Half a day to a day. The power is off while the board is being changed.

Will my old wiring work with a new board?

Usually, yes. Every circuit is tested first. If a fault is found, TMB Electrics provides a separate price before repair work proceeds.

Is a new fuse board notifiable?

Yes. TMB Electrics certifies and notifies the work under Part P and provides the certificate.

Book or ask a question

Calls answered 24/7