EICR and electrical testing in Reigate
TMB Electrics carries out EICR and electrical testing in Reigate for homeowners, landlords and businesses, leaving every customer with a written report that codes each finding.
Calls answered 24/7
- 14 years trading
- Local to Banstead
- Clear, upfront quotes
The price of an EICR in Reigate
The price covers the full inspection, all testing and the written report with its coded findings. What changes it is the size of the installation and how long the visit takes.
From £150
EICR: from £150
Commercial EICR: from £150
Included in the inspection
- Consumer unit, circuit protection and RCDs
- Fixed wiring and every circuit
- Sockets, switches, lighting and fixed appliances
- Earthing and bonding
- A written report with any findings coded C1, C2, C3 or FI
Ways to pay


- Pay by bank
- Bank transfer
- The figure is confirmed in writing before the visit, so there are no surprises once testing starts.
- Remedial work is quoted separately after the report, so the inspection price never absorbs repair costs.
- Larger installations and commercial units take longer to test, which is reflected in the price.
EICR and electrical testing across Reigate
We serve Reigate from our base in Banstead.
What happens on the day
Allow two to four hours for a house, longer for a large property or commercial unit. Circuits lose power one at a time, not all together.
- Arrival and accessWork begins at the fuse board and meter position, then moves room by room through a sample of sockets, switches and lights. Clearing around the board beforehand saves time on the day.
- Dead testing each circuitEach circuit is isolated in turn for dead testing, so only one part of the property loses power at a time. Anything that must stay live is worth listing at the start.
- Live tests and readingsWith circuits back on, live tests such as earth loop impedance and RCD trip times check that protective devices disconnect the supply fast enough in a fault.
- The report before leavingAny findings are talked through at the end of the visit, then the written report follows with every observation coded so the condition of the installation is on record.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose TMB Electrics
- Reviews
- 38
- Rating
- 5.0
- Trading since
- 2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”
Trevor Bush, TMB Electrics
Book NowPhotos of our work
What does an EICR inspection actually check?
The whole fixed installation from the meter to the last socket: the consumer unit and its protective devices, every circuit, sockets, switches, lighting and fixed appliances, plus earthing and bonding.
How long is an EICR valid for a rental?
At least once every five years in England, and sooner where the current report has set an earlier date. A copy goes to the tenant, and the council may ask to see it.
What do the codes C1, C2, C3 and FI mean?
C1 is danger present, C2 is potentially dangerous, C3 is an improvement recommendation and FI means further investigation is needed. Only C1, C2 and FI make a report unsatisfactory.
Do I need an EICR before buying an older house?
It is worth having. The inspection shows the condition of the wiring before the purchase is committed to, rather than discovering it after the keys are handed over.
Will the inspection turn the power off?
Circuit by circuit, not all at once. Each one is switched off for dead testing and brought back before the next goes down, so anything that cannot lose power should be mentioned first.
