EICR and electrical testing in Ashtead

TMB Electrics, based in Banstead, inspects the Ashtead wiring that is there now. A second consumer unit off Craddocks Avenue is reported as that unit, not as the age of the house.

Calls answered 24/7

  • 14 years trading
  • Local to Banstead
  • Clear, upfront quotes

Ashtead condition report price

What you pay for is the Ashtead inspection and the report that follows those tests. Several boards on the Ashtead Park side are named in the quote when the house has them. Remedial work comes afterwards.

From £150

EICR: from £150

Commercial EICR: from £150

Included in the inspection

  • Consumer unit, circuit protection and RCDs
  • Fixed wiring and every circuit
  • Sockets, switches, lighting and fixed appliances
  • Earthing and bonding
  • A written report with any findings coded C1, C2, C3 or FI

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Pay by bank
  • Bank transfer
  • Plug in appliances are a PAT visit, not part of this report.
  • A house with more boards than a straightforward semi is priced with that count visible before the day.
  • Anything the report recommends is not started under this figure.

View the EICR cost guide for Ashtead

EICR and electrical testing across Ashtead

We serve Ashtead from our base in Banstead.

The StreetBarnett Wood LaneWoodfield LaneCraddocks AvenueAgates LaneOttways LanePark LaneAshtead ParkAshtead CommonAshtead station

What happens on the day

Age is not the result. 1930s houses off Craddocks Avenue and Woodfield Lane are mostly already on a second consumer unit, and the report describes that unit. Extended interwar semis on Barnett Wood Lane and Agates Lane are inspected circuit by circuit, including the circuits added with the extension. Large houses on the Ashtead Park side are reported board by board, outbuildings included.

  • Report the unit that is thereWoodfield Lane houses on a second consumer unit are written up as that unit. The original installation is not assumed to be the one on the wall, and the test results are what the report carries.
  • Include every boardAshtead Park houses that spread the supply over several boards and outbuildings have each of those boards on the same report. A board in an outbuilding is not left off because the house board passed.
  • Sample without cuttingPeriod cottages along The Street are sampled at the board and at accessible points. The building is not opened through so a cable can be seen, and a limit is written where a finish has to stay.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose TMB Electrics

Photo of Trevor BushTrevor BushElectrician
Reviews
38
Rating
5.0
Trading since
2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”

Trevor Bush, TMB Electrics

Book Now

Photos of our work

Kitchen downlights and under-cabinet lighting switched on
Linear pendant lit above a kitchen island during refurbishment
Smart fridge freezer powered up during a kitchen refurbishment
Cooker control switch and sockets fitted above a worktop
External electricity meter cabinet mounted on a brick wall
Downlights and a smoke alarm in a newly plastered ceiling

Ashtead report questions

Still have a question?

Does a 1930s house off Craddocks Avenue fail because of its age?

No. Most of those houses are already on a second consumer unit, and the report follows the tests on that unit. The decade the house was built is not a code.

Are outbuildings on the Ashtead Park side part of the same report?

Yes. Where the supply is spread over several boards, each board is inspected, including the one in an outbuilding. The quote names the count when it is high.

Will a cottage on The Street be opened so a cable can be seen?

Not where the finish has to stay. The sample uses the board and the points that can be reached, and the report records the limit instead of cutting the building.

Do planning rules at Ashtead Park change the test result?

No. Mole Valley constraints and the local nature reserve matter when later work would touch protected land, trees or a visible feature. An indoor inspection is judged on the wiring.

Are long serving circuits on Agates Lane condemned for being old?

No. Extended semis there are tested circuit by circuit. A circuit that still meets the tests is reported as it is, including one that was added with the extension.

Book or ask a question

Calls answered 24/7