Armoured cable supply run in Kingswood

Kingswood armoured cable feeds a detached building when the old feed failed or never existed. The house itself is not dug up.

Calls answered 24/7

  • 14 years trading
  • Local to Banstead
  • Clear, upfront quotes

How a Kingswood armoured feed is costed

For one detached building, the figure follows cable size and which board the feed leaves. The dig is described before the day. Original wiring in the house stays put. With no detached building, there is no trench.

From £250

Included

  • Planning the cable path from the consumer unit or isolator to the far end
  • Laying of steel wire armoured (SWA) cable, buried or clipped as the quote sets out
  • Glands and terminations at both ends
  • Continuity and insulation resistance tests on the new run
  • A minor works certificate or installation certificate for the circuit

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Pay by bank
  • Bank transfer
  • Paths and planting go back only if the note already says so next to the cable size.
  • Work on the board at either end is described as its own line.
  • Sockets and lights inside the building, after the feed arrives, are the outbuilding task.

Armoured cable supply run across Kingswood

We serve Kingswood from our base in Banstead.

Waterhouse LaneWarren DriveThe WarrenFurze HillWoodland WayCopthill LaneKingswood stationLower Kingswood

What happens on the day

This cable is a fresh feed into a detached building, either because the old cable failed or because nothing has ever fed it. Digging is not how a Costain house replaces original wiring. Both ends and the ground between are marked before a spade is used. The feed arrives on that building's board, often the unit already in the outbuilding. Wanting an indoor circuit off Copthill Lane is not a reason to dig.

  • Mark both ends firstWe mark the line from the supply board to the detached building and photograph both ends before any digging. A live socket at the far end is not a passed cable test.
  • Leave the house wiring in the houseCostain additions and the original wiring remain indoors. Opening the garden does not feed those rooms.
  • Land on the outbuilding boardThe new feed ends on the board for the detached building. Where a unit is already in the outbuilding, that is the landing point. A new board is not invented so the trench has somewhere to arrive.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose TMB Electrics

Photo of Trevor BushTrevor BushElectrician
Reviews
39
Rating
5.0
Trading since
2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”

Trevor Bush, TMB Electrics

Book Now

Photos of our work

External electricity meter cabinet mounted on a brick wall
Downlights and a smoke alarm in a newly plastered ceiling
Under-cabinet lights, socket and grid switch above a worktop
Sockets and under-unit lighting in a fitted shaker kitchen
First fix back boxes and downlights in a stripped kitchen
Ceiling downlights and a wall light in a finished living room

Questions about Kingswood armoured cable

Still have a question?

Is a Costain house fed by digging the garden?

No. Original wiring and later additions stay in the house. Digging is reserved for a detached building that needs power brought to it.

When is a new feed used?

After the cable there fails, or where nothing has ever fed the building. A lamp still lighting at the far end does not count as a pass.

Does the feed land on the outbuilding board?

When that board is already there. Large plots often have one in the outbuilding. A new board is not added just so the cable has somewhere to arrive.

Is a Woodland Way extra circuit a trench?

No. Those newer houses generally want extra circuits in the house. A trench to a detached building is a different job.

Is the line of the trench chosen on the day?

No. Line and depth are fixed on the paper before anyone arrives. Shifting either is costed before the line moves.

Book or ask a question

Calls answered 24/7