Part P non compliance: what to do
TMB Electrics checks electrical work in Banstead with an EICR and identifies faults or missing work that need attention.
Calls answered 24/7
- 14 years trading
- Local to Banstead
- Clear, upfront quotes
Why might electrical work not meet Part P?
Part P covers electrical safety in dwellings. Problems can arise when work has not been properly tested, documented or installed safely.
- Work was added without testingA new circuit, replacement consumer unit or alteration may have been put into use without the tests needed to check protection, earthing and connections.
- The consumer unit has unsuitable protectionAn older consumer unit may not provide the protection expected for the circuits it supplies. Testing shows how the circuits and protective devices perform.
- A fault has developed after the workA damaged cable, loose connection or failed accessory can affect an installation after earlier electrical work was completed.
- Earlier work has not been recordedElectrical work may need an installation certificate, a minor works certificate or Building Regulations notification, depending on the work carried out.
What can I check safely before booking?
You can gather useful details without opening the consumer unit, removing electrical fittings or touching mains wiring.
- Find any electrical paperworkLook for an Electrical Installation Certificate, minor works certificate, EICR or Building Regulations paperwork kept with the property records.
- Note what work was doneWrite down which room, circuit or electrical item was changed, and whether sockets, lights or fixed equipment now show a problem.
- Look for visible damageDo not use sockets, switches or fittings with scorch marks, cracking, smoke, unusual warmth or a burning smell.
When should I book an electrical inspection?
Book an inspection when electrical work has no paperwork, an EICR has raised findings, or the installation shows a fault or sign of overheating.
- There is no record of the workAn EICR can assess the fixed wiring and record its present condition when earlier paperwork is missing.
- A report shows C1, C2 or FI findingsC1 means danger is present, C2 means potentially dangerous, and FI means further investigation is needed before the installation can be judged satisfactory.
- A circuit trips or a fitting overheatsA circuit that will not stay on, or a fitting with heat damage, needs testing before it is used again.
What happens during a Part P compliance visit?
The visit checks the fixed installation and records what testing finds, starting with the consumer unit and the circuits included in the inspection.
- The installation is identifiedThe consumer unit, earthing and accessible circuits are checked to establish what forms part of the installation.
- The circuits are testedTesting checks circuit protection, wiring, sockets, switches and fixed fittings in the areas covered by the inspection.
- The findings are recordedThe EICR records observations using the relevant codes and explains whether further investigation or remedial electrical work is needed.
What does the inspection price cover?
The price covers inspection and testing of the fixed electrical installation, followed by a written EICR. It changes with the number of circuits, the size of the property and any areas that need further investigation.
From £150
EICR — domestic: from £150
EICR — commercial: from £150
Included in the inspection
- Consumer unit, circuit protection and RCDs
- Fixed wiring and every circuit
- Sockets, switches, lighting and fixed appliances
- Earthing and bonding
- A written report with any findings coded C1, C2, C3 or FI
Not included automatically
- Portable appliances, which are PAT testing
- Repairs, which are quoted separately once the report is done
- Anything that cannot be reached safely on the day
Ways to pay


- Pay by bank
- Bank transfer
- The inspection covers the consumer unit, fixed wiring and accessible electrical accessories included in the visit.
- Repairs, replacement parts and further investigation are priced separately when testing identifies the work needed.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Why choose TMB Electrics
- Reviews
- 39
- Rating
- 5.0
- Trading since
- 2012
“I keep things straightforward: you deal with me from the first quote to the final check, with clear advice and no surprises along the way.”
Trevor Bush, TMB Electrics
Book NowWhat is Part P non compliance?
Part P is the Building Regulations requirement for electrical safety in dwellings. Non compliance can mean electrical work is unsafe, has not been properly tested, or does not have the paperwork required for that work.
Can an EICR show whether my wiring is safe?
An EICR inspects and tests the fixed electrical installation and records its condition. It can identify observations that need repair, improvement or further investigation.
Do I need paperwork for electrical work in my home?
The paperwork depends on the work carried out. New installations and some alterations need an Electrical Installation Certificate, while smaller alterations may need a minor works certificate.
Related problems
- Aluminium wiring in the houseAluminium wiring needs inspection and testing before any repair, upgrade or added circuit.
- Buying a house with old electricsAn EICR checks the fixed wiring so you know its condition before buying.
- Electrical fire: what to doGet out, stay out and call 999. Electrical work starts after the fire is dealt with.
- Flooded electrics after leak or floodWater damaged electrics need testing before affected circuits, fittings or fixed equipment are used again.
- House not up to electrical regulationsAn EICR identifies fixed wiring that needs repair, improvement or further investigation.
- How to tell if your house needs rewiringAn EICR can show whether fixed wiring needs rewiring, partial renewal or repair.
Sources
- HM Government: Approved Document P Electrical Safety
- Building Regulations Part P: Electrical Safety in Dwellings
- HM Government: When Building Regulations approval is needed
Updated 19 November 2026
